These photographs show one to two acre Lakes we constructed between 2005 to 2022.
A lake built for a client in Exmoor, one on a golf course near Poltreath, another in Dawlish Devon. All had serious amounts of earthmoving
done and shaping with drainage systems carried out and they all were installed with a HDPE welded Liners. Topsoils were reinstated and landscaped around afterwards.
Looking back they were tough projects because of the geology in their areas but seeing them now after all this time and how they have established and settled in with an abundance of wildlife habitats created in the process is truly heartwarming.


